Since I will be using Robart hinge points instead of CA hinges, the next step in the stab construction was to locate and drill the holes for the hinge points in both the stab TE and the elevator LE. I started by marking a centerline down the stab LE and the holes based on the location of balsa blocks installed when assembling the stab.

20180929_173025

Looks good, but there were two problems; 1) I did not notice that the ribs in the elevator are offset from the ribs in the stab, so the center hole ended up right on a rib. 2) I used an older twist drill and despite best efforts, I did end up with a small bit of drill wander and some of the holes were not aligned with the center-line. So, plugged up the holes with some scrap balsa glued in with Titebond, and started again, this time with using a sharp spade-point bit.

20180929_173226

After getting a good set of (near) perfectly aligned holes in the elevator LE, I clamped them LE to the stab and transferred the holes to the stab TE.

20180929_175000

Although holes are lined up perfectly in the TE, when drilling through the balsa blocks, I got a bit of drill wander again (ugh), with on hole exiting above center and another exiting below. It should be good enough though as the LE moves freely when mocked up with the hinges.

20180930_131013

Next up is the cross grain reinforcement between the center ribs, and finally the sheeting.

20180930_154748

20181007_145525

After removing the pins, I added an extra fillet of Titebond around all the ribs, the LE, and the TE.

20181007_190200

I will be traveling a bit for work, so it will be a while before I will be able to get to the bottom sheeting. At least it will give the glue plenty of time to dry!

Total build hours to date: 19.5